Construction Prototype · pilot

Linking completed quantities to the BIM model via estimates and certificates

The prototype links lines of cost estimates and completion certificates to specific BIM elements and tracks designed, claimed and accepted quantities with full traceability.

99.4%link accuracy on the independent test (target ≥ 95%)
97.2%lines linked automatically (target ≥ 70%)
0.30%quantity allocation error (target ≤ 2%)

01Challenge

Estimates and completion certificates often contain aggregated items without element IDs. Linking only to a floor or a type of work makes it impossible to check which elements and quantities were counted, to prevent double claims or to rebuild the calculation after the model changes.

02Solution

  • Parsing of estimates and KS-2 completion certificates in XLSX and PDF: columns in any order, different units of measure
  • Rules and AI parse every line: type of work, floor, section, work zone, grid lines, thickness, concrete class; an AI value is accepted only if its fragment is found in the line text
  • Code selects the elements — by attributes, estimate item and the quantity remaining after earlier claims
  • Many-to-many links, partial completion, duplicate and overrun control
  • A corrected certificate replaces the links of the previous version; a new model version carries links over by GUID
  • 3D model: highlight elements for an estimate line and lines for an element

03Results

  • Link accuracy of 99.4% on the independent test and 100% on the control set
  • Quantity allocation error of 0.30% against a target of at most 2%
  • Re-uploading a certificate never double-counts; every link stores its source and model version
  • All duplicates, overruns and estimate-model discrepancies were found